规范. 1-16 Location of non-oil filled electrical equipment
规范. 1-17 Location of oil filled pad-mounted equipment (1 of 2)
规范. 1-17 Location of oil filled pad-mounted equipment (2 of 2)
规范. 1-19 General clearance for pad-mounted switchgear
规范. 1-20 Installation procedure for protective bollards used with pad-mounted equipment
规范. 1-23 Clearance required for non-enclosed swimming pools, fountains and similar installations (1 of 2)
规范. 1-23 Clearance required for non-enclosed swimming pools, fountains and similar installations (2 of 2)
规范. 1-43 Trenching for underground cables
规范. 1-44 黑绿豆布局
规范. 1-45 Subdivision staking requirements for all 坦帕电 equipment in easements (1 of 2)
规范. 1-45 Subdivision staking requirements for all 坦帕电 equipment in easements (2 of 2)
规范. 1-46 Staking requirements for apartments and zero lot line applications
规范. 1-47 Site preparation, three-phase pad-mount transformer installation
规范. 1-48 Site preparation, single-phase pad-mount transformer installation
规范. 6-1 Poured in place concrete pullbox and handhole design
规范. 6-2 "S" Type precast manhole 8' X 12' X 7' (1 of 2)
规范. 6-2 "S" Type precast manhole 8' X 12' X 7' (2 of 2)
规范. 6-3 Precast 5' X 10' - 6" X 7' concrete pullbox/splicebox (1 of 2)
规范. 6-3 Precast 5' X 10' - 6" X 7' concrete pullbox/splicebox and accessories (2 of 2)
规范. 6-4 Precast 6' X 12' X 7' concrete pullbox/splicebox (1 of 2)
规范. 6-4 Precast 6' X 12' X 7' concrete pullbox/splicebox and accessories (2 of 2)
规范. 6-5 Precast 4' - 4" X 13' - 4" X 6' - 0" concrete pullbox/splicebox (1 of 2)
规范. 6-5 Precast 4' - 4" X 13' - 4" X 6' - 0" concrete pullbox/splicebox and accessories (2 of 2)
规范. 6-7 Polymer concrete pullbox 30" X 60" X 48"
规范. 6-8 Precast 10' - 0" X 8' - 6" X 7'- 0" T-type manhole
规范. 6-9 Precast manhole 10' X 10' X 7' (1 of 2)
规范. 6-9 Precast manhole 10' X 10' X 7' (2 of 2)
规范. 6-11 Pad design for single-phase pad-mounted transformers
规范. 6-12 Pad design for three-phase pad-mounted transformers
规范. 6-18 Conduit/pad details - 600 AMP - P.S.E. multi-compartment gang-operated, live-front
规范. 6-20 Pad detail for pad-mounted secondary termination cabinet
规范. 6-21 Splicebox/light traffic handhole 30" X 48" X 18"
规范. 7-16 Conduit detail for three-phase pad-mounted transformer
规范. 7-26 Requirements for single-phase URD pad-mounted transformer installations
规范. 7-56 Installation procedure for protective bollards used with pad-mounted equipment
规范. 11-2 Secondary connectors single-phase URD pad-mount transformer
规范. 12-26 Pad-mounted secondary cabinet (1 of 3)
规范. 12-26 Pad-mounted secondary cabinet (2 of 3)
规范. 12-26 Pad-mounted secondary cabinet (3 of 3)
规范. 13-17 Minimum space requirements for flammable liquid filled pad-mounted transformer in indoor vault
规范. 13-21 Minimum space requirements for 600 AMP auto-throwover pad-mounted switching equipment (PSE) on grade indoor vault (1 of 2)
规范. 13-21 Minimum space requirements for 600 AMP auto-throwover pad-mounted switching equipment (PSE) on grade indoor vault (2 of 2)
规范. 13-23 Typical pit and conduit detail for 600 AMP manual and auto-throwover pad-mounted switching equipment vault (1 of 3)
规范. 13-23 Typical pit and conduit detail for 600 AMP manual and auto-throwover pad-mounted switching equipment vault (2 of 3)
规范. 13-23 典型的框架 & cover details 600 AMP manual and auto-throwover pit area (3 of 3)
规范. 13-25 Typical space and installation requirements for metering cabinets
规范. 13-27 Vault space requirements for metal enclosed switchgear
规范. 13-29 Typical conduit details pad-mount transformer in indoor vault